Reports
Inspection reports for all 6 sites
| Report | Site | Inspected | Findings | |
|---|---|---|---|---|
Annual inspectionReport · PDF |
Downer — Wodonga | 12 Sep 2026 | O7 | |
Annual inspectionReport · PDF |
Downer — Myrtleford | 21 Apr 2026 | O3 | |
Annual inspectionReport · PDF |
Downer — Mansfield | 3 Mar 2026 | R1 |
Showing 3 of 14
Historical reports
Inspections carried out before this system, 2013–2023
These reports are held in our previous system and open in a new tab. They are provided for reference and are not part of your current inspection records.
| Report | Site | Date | |
|---|---|---|---|
Racking inspectionExternal link |
Downer — Wodonga | 13 Dec 2023 | |
Racking inspectionExternal link |
Downer — Benalla | 8 Nov 2022 |
Showing 2 of 8